Got a lot more work done over the last couple of days. Since changing the direction of this project, I decided to get the low voltage electrical roughed in pretty quickly. Outside temps are starting to rise so I need to get this done as soon as possible. Got wires for the main light which will be a very long LED light strip, a much shorter LED light bar to light up the work bench, got three 12 gauge wires ran for the solar panels, the conduit ran under ground and attached to the fence in the area where the panels will go, and got all of the speaker wires installed too. Yes, like almost all of my projects, there will be a car radio inside the shed and wires to 3 speakers that will all be mounted in the ceiling in order to save space.
https://m.youtube.com/watch?v=z59AdVuylpc
Up next will be working on the interior paneling and trim work.